Jobs Construction Area Manager near Lethbridge (AB)
Green job Help - Green job - Help

Available jobs

We found 3 construction area manager jobs near Lethbridge (AB) on Job Bank. The job postings found are for all Construction managers (NOC 70010).

Location Available jobs Links
Lethbridge (AB) 3 View job postings >
Alberta 48 View job postings >
Canada 505 View job postings >
Job postings throughout the region
Date posted Job title Employer Location Source
Nov. 26, 2024 construction site manager DECO Windshield Repair Lethbridge (AB) ZipRecruiter
Aug. 29, 2024 site manager, construction Anet Fiber Tech Inc Lethbridge (AB) Job Bank
Nov. 17, 2024 construction project manager Select People Solutions Lethbridge (AB) Monster

News

Read the latest news stories about job creation and layoffs related to the occupation ofconstruction area manager (NOC 70010).

Energy Circle Ltd. (GrowTEC), a Lethbridge bioenergy company, has secured up to $2 million from Agriculture and Agri-Food Canada for Phase 2 of its anaerobic digester expansion project. This funding will enhance the facility's production capacity to 120,000 gigajoules annually by addressing existing bottlenecks and expanding feedstock processing capabilities

  • Other type of event
  • Mining and oil and gas extraction
  • Added on 2024-10-15
  • Lethbridge–Medicine Hat Region, AB

City of Medicine Hat is upgrading its energy infrastructure by providing 200-amp service to new lots, enabling Level 2 electric vehicle (EV) charging. Alberta's EV sector saw a 50% growth in registered electric vehicles from March 2023 to March 2024.

  • Other type of event
  • Construction
  • Added on 2024-10-08
  • Lethbridge–Medicine Hat Region, AB

Methanex Corporation, a global manufacturer and supplier of methanol to industrial markets, is partnering with Calgary-based Entropy Inc. on a preliminary design and engineering study for carbon capture and storage at the Methanex facility in Medicine Hat. The $100M facility is expected to create about 200 construction jobs and several permanent jobs once operational.

  • Job creation
  • Added on 2024-07-18
  • Lethbridge–Medicine Hat Region, AB

JBS Canada will be supplying beef patties to Wendy’s fast-food restaurants across Western Canada from a new $80M storage and distribution centre in Newell County. Construction on the plant will start right away and is expected to be completed by the end of 2025.

Captus Generation, in partnership with Westlake Petroleum, is planning to build a natural gas-fired power plant with incorporated carbon capture and sequestration in the MD of Pincher Creek.

  • Job creation
  • Added on 2024-05-29
  • Lethbridge–Medicine Hat Region, AB

The City of Medicine Hat is starting construction work on bridges, road improvements, water and sewers and utility upgrades totaling over $40M. Some of the work will continue until fall 2024 and if required into the 2025 construction season.

  • Job creation
  • Construction
  • Added on 2024-04-18
  • Lethbridge–Medicine Hat Region, AB
Labour Market Information Survey
Date modified: